Copperas Cove |
Code of Ordinances |
Chapter 4. BUILDINGS, CONSTRUCTION, RELATED ACTIVITIES |
Article V. LANDSCAPE IRRIGATION SYSTEMS |
Division 3. LICENSE, PERMIT, INSPECTIONS AND FEES |
§ 4-163. Required inspections.
(a)
The regulatory authority, upon notification from the permit holder or the permit holder's authorized agent, shall make the following inspection and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or an agent of any violations that must be corrected. The holder of the permit shall be responsible for the scheduling of the inspections:
(1)
Underground inspection shall be made after trenches or ditches are excavated, piping and control wiring installed and before any backfill is put in place.
(2)
Final inspection shall be made after the installation is complete and operational and the installation is ready for use.
(3)
Where any work does not pass any initial inspection, the necessary corrections shall be made to comply with this chapter. The corrected work shall then be rescheduled for inspection.
(Ord. No. 2010-48, § 1(Exh. A), 11-2-10)